| Tanggal | Keterangan | Masuk (Debet) | Keluar (Kredit) | Aksi |
|---|---|---|---|---|
| 09-03-2026 | 1 Nodrop 004, 1 Nodrip 021, 1 Nodrop 025, 1 pell Nodrop 034 | - | 1.815.000 | Detail |
| 09-03-2026 | Pencairan BOP Pekerjaan Pengecatan | 12.000.000 | - | Detail |
| 08-03-2026 | 2 Nodrop 025 77.000x2 = 154.000 3 Nodrop 021 80.000x3 = 240.000 1 Nodrop 004 237.000x1 = 237.000 6 Kuas 2" 12.000x6 = 72.000 2 Kuas 4" 20.000x2 = 40.000 2 Kapi 17.000x2 = 34.000 5 Timba 8.000x5 = 40.000 | - | 817.000 | Detail |